RESIN FLOORING CASE STUDY

Hospital Resin Flooring Yorkshire

Location
Yorkshire
Sector
Healthcare
System
Heavy Duty Flowable Resin Flooring
Floor area
760m²

Project Overview

The NHS Project posed a unique challenge: tight timelines set by the main contractor coupled with a demanding workload due to a faulty screed overlaying the concrete substrate.

To add to the intricacies, our team was to operate amidst other contractors. This dynamic required not only skill but also impeccable coordination.

The discovery of the damaged screed meant that our initial workload, which was already demanding, had escalated. With a looming deadline and a site teeming with other contractors, the solution was clear. Operating throughout the night, across multiple days, would be the best approach to maintain efficiency while ensuring minimal disruptions.

Assessment and Recommendation

Machinery and tool selection would play a pivotal role, especially under existing time pressures. After a thorough assessment, our team devised a strategy. Firstly, comprehensive substrate repairs would be carried out, followed by an essential double priming.

The flooring solution would be ta 3mm-4mm polyurethane flowable screed. This approach was tailored to meet the client’s exacting standards, ensuring a balance of functionality, visual appeal, and durability against daily wear and tear.

Preparation and Repair

Our task commenced with a deep dive into the problematic screed to revert to the original substrate. This phase saw the deployment of heavy-duty scabblers, kango hammers, and a precise double-headed grinder. Each tool was chosen for its specific role, ensuring a flawless preparation.

Once the underlying concrete was ready, the team seamlessly transitioned into the repair phase. This involved the usage of specialised repair mortars and scratch coats to address any inconsistencies or defects, reinforcing our commitment to quality and durability.

Installation Details

Two meticulous coats of epoxy primer were applied to the substrate, a step ensuring complete sealing and eliminating potential pin holing in the concluding stages.

The Finished Floor

Client Feedback and Satisfaction

Our unwavering dedication and adaptability culminated in an impressive early finish, with the project wrapping up in 6 nights as opposed to the expected 7.

Beyond the timely completion, the project earned JD Flooring commendations for our stellar work ethic, professionalism, and exceptional craftsmanship from the main contractor and especially from the NHS.

THE SYSTEM WE INSTALLED

Resin Flooring Type Used

Heavy Duty Flowable Resin Flooring

A three part filled system that self smooths to a seamless finish at 4mm or 6mm. It is specified for heavy to very heavy duty use where cleanability matters as much as durability.

Resistance in wet conditions depends on the seal coat selected. Anticipated life is 10 to 12 years under medium duty use and 5 to 7 years under heavy duty use. Static controlled versions are available.

Heavy Duty Flowable Resin Flooring characteristics
Application3 part filled system providing a self-smoothing finish
Intended UseHeavy duty to very heavy duty use
Thickness4mm & 6mm
Slip ResistanceSome resistance in wet conditions subject to seal coat selection
Anticipated LifeMedium duty 10-12 years / Heavy duty 5-7 years
ChemicalsVery good chemical attack properties
CleanabilityVery good cleanability
StaticStatic controlled versions available
EXPLORE THE PORTFOLIO

More Case Studies Like This One

A prominent UK logistics company in Wolverhampton approached JD Flooring Limited to implement a comprehensive resin flooring demarcation system. As a valued client of over five years, they

WolverhamptonHigh Build Coating

A leading UK paint manufacturer approached JD Flooring Limited to undertake a challenging resin flooring installation project at their Manchester facility.The project involved renovating a 345m² paint storage

ManchesterHigh Build Coating

JD Flooring Limited, a specialist in resin flooring installation since 1999, recently completed a significant project for a leading supermarket distribution centre in Cheshire. The project involved refurbishing

CheshireHigh Build Coating

Our client approached us with a clear vision for upgrading their double garage floor. Their primary focus was on eliminating the persistent dust problem that had been plaguing

CheshireHigh Build Coating

In the demanding environment of a busy hotel kitchen, flooring plays a crucial role in maintaining safety, hygiene, and operational efficiency. When a leading hotel chain in Gateshead

GatesheadHeavy Duty Polyurethane Screed

As the approved contractor for a pharmaceutical company in Liverpool, JD Flooring Limited was tasked with installing a suitable flooring solution for a newly refurbished office space being

LiverpoolHigh Build Coating

As the approved contractor for a school district in Cheshire, JD Flooring Limited was tasked with addressing the deteriorating floor in the main hall of a Primary School.With

CheshireSelf Smoothing

As the approved contractor for a large UK furniture manufacturer, JD Flooring Limited recently undertook a significant industrial flooring project in Lancashire. This case study examines the comprehensive resin

LancashireHigh Build Coating

In the healthcare sector, maintaining a clean and hygienic environment is of utmost importance. This is especially critical in nursing homes, where vulnerable residents and dedicated staff depend on

Stoke-on-TrentHeavy Duty Polyurethane Screed

FREE SURVEY AND FIXED QUOTATION

Talk to Us About Your Floor

Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.

Please enable JavaScript in your browser to complete this form.