Resin flooring contractors Northwich process, industrial and commercial facilities rely on for floors that survive difficult concrete. Supporting sites across Wincham, Rudheath, Gadbrook Park and the Winnington and Lostock Gralam corridor, and throughout the wider Northwich area.
Working for national manufacturers, logistics operators and public sector estates since 1999.
As resin flooring contractors Northwich operators call on regularly, we deal with a problem the other process towns do not have to the same degree. Northwich grew on the brine field and the alkali industry, and the legacy is a working process corridor at Winnington and Lostock Gralam alongside modern business park and warehousing stock.
What separates it from Runcorn and Ellesmere Port is the age and condition of the concrete. Much of the industrial floor area sits in long-established buildings where the surface has absorbed decades of chemical contact, been patched repeatedly, and may carry residual salt, moisture or contamination from earlier processes.
So the failure is blistering and adhesion loss rather than chemical attack alone. The technical story here is diagnosis before system selection, and testing is the part of the specification that decides whether the floor survives.
Almost every failed industrial floor comes back to the same four variables: the condition of the substrate, the quality of the preparation, the temperature and contamination on site, and whether the system was matched to the traffic it actually carries.
Get those right and a resin floor runs for fifteen years and more. Get them wrong and it blisters, delaminates or dusts within a year or two, regardless of what the manufacturer’s datasheet claims.
We survey the substrate before we quote it. That means moisture testing, an assessment of what is already down, and a written specification naming the system, its FeRFA type and its thickness — so you know what you are buying and so does anyone who has to approve it.
Diamond grinding or shot blasting back to sound concrete, moisture testing to confirm the substrate is dry enough to coat, and repair of cracks, joints and spalled areas before any resin is mixed. Skipping this is why cheap floors blister and peel.
Substrate condition, preparation quality, temperature and contamination are the four variables that determine whether a resin floor lasts fifteen years or fifteen months. FeRFA guidance is explicit: resin flooring follows the substrate profile beneath it.
The historic and continuing process area, with plant buildings, transfer zones and heavily contaminated concrete.
Process and industrial premises along the corridor, where exposure history matters as much as current use.
An established industrial and warehousing area off the A559, with manufacturing, storage and trade units.
Mixed industrial and storage premises carrying steady heavy vehicle movement through the whole working day.
A major business park with commercial and technical occupiers, generating plant room and service area work.
Older industrial and storage buildings along the navigation, with notably variable substrate condition.
Resistant build-ups selected against a documented exposure profile rather than a general claim.
Contamination assessment, moisture testing and repair before any system is chosen or priced.
Non-absorbent, spill-tolerant surfaces with containment detailing at transfer and decant points.
Impact and abrasion resistance on the ageing concrete at Wincham and right across Rudheath.
Durable joint treatment and load tolerance where handling plant runs the same routes daily.
Seamless, reagent-resistant, cleanable finishes for quality control and technical areas.
A resin floor that blisters or lifts is almost never a resin problem. On Northwich concrete it is moisture, residual contamination or laitance, and no coating specification will overcome any of the three if they are not found first.
Hygrometer readings taken inside the concrete. Standard epoxies tolerate roughly 75 to 80 per cent relative humidity, no more.
Decades of chemical contact leave residues that stop adhesion, so historic exposure is assessed before a system is chosen.
Under EN 1504-2 the resin protects degraded concrete from further ingress, which makes repair part of the specification.
Preparing legacy concrete in Northwich raises two issues at once. Grinding releases respirable crystalline silica, limited under EH40 to 0.1 mg per cubic metre over an eight-hour period, and on these buildings it can also disturb historic process residues.
So every machine runs coupled to H-class extraction, shared areas are screened, and waste is contained rather than swept. That is standard practice here rather than an upgrade, because the alternative moves a problem from the floor into the air.
The work is then phased area by area or into shutdown windows, so process areas, warehouse bays and Gadbrook Park plant rooms are handed back as they cure rather than the building stopping.
Hygrometer testing and moisture-tolerant primers are the decisive part of the specification on legacy concrete.
Where resin protects degraded concrete from further chemical ingress, repair and protect replaces replacement.
Respirable crystalline silica is limited to 0.1 mg per cubic metre over eight hours, so extraction is standard.
Where process areas drain to controlled systems, permitting governs falls, upstands and joint detailing.
FeRFA classifies resin flooring into eight types by build-up and thickness, and BS 8204-6 governs which one a floor actually needs. Polyaspartic and MMA sit outside that classification because they describe the resin chemistry rather than the build-up. In Northwich the system matters less than what sits beneath it, which is why testing comes first.
FeRFA Type 1. Two or more coats up to 150 microns, binding a dusting substrate and giving a cleanable surface. From £8 per square metre.
FeRFA Type 2. Dual component to 300 microns, solvent free, in gloss, matt or silk. Chemical resistance with a decorative finish.
FeRFA Type 3. Up to 1000 microns over prepared concrete and the system specified on most industrial jobs. Takes colour well for demarcation.
FeRFA Type 4. Multi-coat build at 1 to 3mm with aggregate broadcast between coats, for impact and constant wear.
FeRFA Type 5. Flow-applied at 2 to 3mm for a seamless finish where hygiene and cleaning matter more than impact resistance.
FeRFA Type 7. Three part filled system at 4 to 6mm thickness, giving a self-smoothing finish for heavy and very heavy duty areas.
FeRFA Types 7 and 8. Trowel-applied at 6 to 9mm to take thermal shock, steam cleaning and constant heavy forklift traffic.
Cures at temperatures down to −5°C and is ready in around two hours. Installed overnight or at a weekend it can remove the need to shutdown entirely.
Cures in hours, but the odour can taint food, fabrics and stock and the area must be cleared and ventilated. Better suited to new build and refurbishment projects.
Rates run from £8 per square metre for a floor seal to £45 for MMA, inclusive of preparation, labour and materials. On legacy concrete the preparation and repair are priced separately, because that is where the real variable sits.
| System | FeRFA | Thickness | Per m² |
|---|---|---|---|
| Floor Seal | Type 1 | Up to 150µm | From £8 |
| Epoxy and PU Coating | Type 2 | 150 – 300µm | £8 – £12 |
| High Build Coating | Type 3 | 300 – 1000µm | £8 – £12 |
| Multi-Layer Flooring | Type 4 | 1 – 3mm | £12 – £16 |
| Self-Smoothing | Type 5 | 2 – 4mm | £20 – £30 |
| Heavy Duty Flowable | Type 7 | 4 – 6mm | £25 – £35 |
| Heavy Duty PU Screed | Type 8 | 6 – 9mm | £30 – £40 |
| Polyaspartic | Chemistry | 300 – 500µm | £38 |
| MMA | Chemistry | 2 – 6mm | £45 |
Inclusive of preparation, labour and materials. Rates assume a sound, accessible substrate and are indicative until the floor has been surveyed. Polyaspartic and MMA sit outside the FeRFA type classification because they describe the resin chemistry rather than the build-up.
A three day shutdown at a plant turning over £2,000 an hour is £120,000 of lost output. On most sites that is several times the price of the floor.
Five contractors quoted one timber processing plant. All five proposed the same system and a three to four day closure. None of them costed the closure.
We proposed a faster-curing system installed across a weekend. A higher rate per square metre, and no shutdown at all. On the client’s own figures the avoided losses exceeded the price of the floor.
We install evenings, weekends and one bay at a time.
Whether a shutdown costs you thousands an hour or simply gets in the way, you do not always have to close your site for a resin flooring installation.
Crack stitching, patch repair and joint sealing on the older Wincham and Rudheath units.
Traffic routes, walkways and process zone separation applied in resin rather than in tape.
Damp proof membrane where a substrate fails moisture testing, supplied as a standalone package.
Resistant build-ups laid on diagnosed and repaired concrete, phased around continuing operations.
Contaminated historic floors tested, prepared under extraction and overlaid rather than replaced.
Plant rooms, kitchens and service corridors at Gadbrook Park installed in short working windows.
We work across the town regularly, from Wincham and Rudheath through to Gadbrook Park and the Winnington and Lostock Gralam corridor. We are Cheshire based rather than Northwich based, so a survey usually happens within days and there is no mobilisation charge for attending.
Almost always moisture or contamination in the concrete beneath, not the resin above. Vapour driving up through the substrate pushes the coating off, and residues left by earlier processes stop it bonding in the first place. Both are found by testing before specification, which is why we test rather than assume.
Usually, yes. Most of what we do here is repair and protect rather than replacement. We assess soundness, moisture and contamination, repair what needs it, and use EN 1504-2 as the framework for protecting the remaining concrete from further ingress.
Every machine runs coupled to H-class extraction, shared areas are screened and waste is contained rather than swept. That matters more here than elsewhere because grinding legacy concrete can disturb historic process residues as well as releasing silica.
Chemical resistance is a property of the individual system rather than of resin flooring generally, so we ask for your COSHH register at survey and specify against concentration, temperature and contact duration. Epoxy covers acid, alkali and general process exposure, polyurethane where thermal cycling or impact is added.
From £8 per square metre for a floor seal up to £45 for MMA, inclusive of preparation, labour and materials. Preparation and repair on legacy concrete are priced separately. The full table by system is on the cost page.
Winsford · Middlewich · Knutsford · Runcorn · Widnes · Chester · Warrington
Tell us what the floor has been exposed to, how old the building is and when the area can be released. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.
Cookies on this site
We use strictly necessary cookies to make this site work. With your permission we would also like to use analytics cookies to see how the site is used so we can improve it. You can change your choice at any time. See our cookie policy.