The NHS Project posed a unique challenge: tight timelines set by the main contractor coupled with a demanding workload due to a faulty screed overlaying the concrete substrate.
To add to the intricacies, our team was to operate amidst other contractors. This dynamic required not only skill but also impeccable coordination.
The discovery of the damaged screed meant that our initial workload, which was already demanding, had escalated. With a looming deadline and a site teeming with other contractors, the solution was clear. Operating throughout the night, across multiple days, would be the best approach to maintain efficiency while ensuring minimal disruptions.






Machinery and tool selection would play a pivotal role, especially under existing time pressures. After a thorough assessment, our team devised a strategy. Firstly, comprehensive substrate repairs would be carried out, followed by an essential double priming.
The flooring solution would be ta 3mm-4mm polyurethane flowable screed. This approach was tailored to meet the client’s exacting standards, ensuring a balance of functionality, visual appeal, and durability against daily wear and tear.
Our task commenced with a deep dive into the problematic screed to revert to the original substrate. This phase saw the deployment of heavy-duty scabblers, kango hammers, and a precise double-headed grinder. Each tool was chosen for its specific role, ensuring a flawless preparation.
Once the underlying concrete was ready, the team seamlessly transitioned into the repair phase. This involved the usage of specialised repair mortars and scratch coats to address any inconsistencies or defects, reinforcing our commitment to quality and durability.

Two meticulous coats of epoxy primer were applied to the substrate, a step ensuring complete sealing and eliminating potential pin holing in the concluding stages.







Our unwavering dedication and adaptability culminated in an impressive early finish, with the project wrapping up in 6 nights as opposed to the expected 7.
Beyond the timely completion, the project earned JD Flooring commendations for our stellar work ethic, professionalism, and exceptional craftsmanship from the main contractor and especially from the NHS.
A three part filled system that self smooths to a seamless finish at 4mm or 6mm. It is specified for heavy to very heavy duty use where cleanability matters as much as durability.
Resistance in wet conditions depends on the seal coat selected. Anticipated life is 10 to 12 years under medium duty use and 5 to 7 years under heavy duty use. Static controlled versions are available.
| Application | 3 part filled system providing a self-smoothing finish |
|---|---|
| Intended Use | Heavy duty to very heavy duty use |
| Thickness | 4mm & 6mm |
| Slip Resistance | Some resistance in wet conditions subject to seal coat selection |
| Anticipated Life | Medium duty 10-12 years / Heavy duty 5-7 years |
| Chemicals | Very good chemical attack properties |
| Cleanability | Very good cleanability |
| Static | Static controlled versions available |
WalesHigh Build Coating
BirminghamHigh Build Coating
KnutsfordHigh Build with Quartz Aggregate
Cheadle HulmeHigh Build Coating
DisleyHigh Build Coating
CheshireHeavy Duty Polyurethane Screed
West YorkshireHigh Build Coating
East YorkshireHigh Build Coating
StaffordshireHigh Build Coating
Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.