RESIN FLOORING CASE STUDY

Aerospace Resin Flooring Birmingham

Location
Birmingham
Sector
Aerospace
System
Resin High Build Coating
Floor area
95m²

Project Overview

As part of a long-term refurbishment programme within a world-leading aerospace manufacturing facility in Birmingham, this phase covered approximately 95m² of operational floor space. The works formed Phase 4 of a structured upgrade strategy, following the same specification adopted across earlier areas of the site.

The existing substrate was heavily worn and affected by bolt holes, minor impact damage and surface inconsistencies typical of high-traffic engineering environments. Because the facility remained operational, the solution needed to combine durability, slip resistance and rapid return to service. JD Flooring installed a fast-curing, multi-layer resin high build system designed to withstand mechanical wear, chemical exposure and regular pedestrian movement, while maintaining a professional, clearly demarcated finish suitable for aerospace manufacturing standards.

Assessment and Recommendation

Following a detailed site survey, our technical team identified widespread surface degradation and a high volume of redundant bolt penetrations across the 95m² area. Access was restricted due to surrounding machinery, meaning large planetary preparation equipment was unsuitable. Therefore, flat bed diamond grinders connected to HEPA-filtered extraction were specified to ensure controlled mechanical preparation in confined working zones.

Preparation and Repair

As with all industrial installations, preparation was the most critical stage of the project. Using flat bed diamond grinding equipment connected to high-powered vacuum extraction, we mechanically removed surface contaminants, weakened laitance and uneven high spots. This ensured the concrete substrate was clean, profiled and ready to accept the resin system.

Once preparation was complete, approximately 300 bolt holes and multiple small impact-damaged areas were repaired using a suitable flexible resin repair compound. Each repair was levelled and feather-finished to maintain surface regularity prior to coating. This meticulous preparation process ensured optimum adhesion and long-term performance, reinforcing the principle that the lifespan of any resin floor is determined primarily by substrate condition and preparation quality.

Installation Details

Following completion of preparation and repairs, installation commenced with the application of the first coat of Polyaspartic high build resin. This fast-curing system was selected specifically to minimise operational disruption while delivering a seamless, durable surface suitable for aerospace manufacturing environments.

After the initial coat had cured, a second high build coat was applied to achieve the required film thickness and surface uniformity. The multi-layer system provided enhanced abrasion resistance and improved longevity under regular foot traffic and equipment movement. A light quartz aggregate was broadcast to improve slip resistance, acknowledging the presence of oils, coolants and routine cleaning regimes common within engineering facilities.

Once curing was complete, a 100mm safety yellow demarcation line was installed around the perimeter of both treated areas. This clearly defined operational zones and reinforced safe pedestrian movement. Due to the rapid curing characteristics of the Polyaspartic system, the floor was ready for use the following day, ensuring minimal disruption to the client’s production schedule.

The Finished Floor

Client Feedback and Satisfaction

The client expressed high satisfaction with both the installation process and the finished result. Particular praise was given to the professionalism of the on-site team, strict adherence to the agreed installation schedule, and the minimal disruption caused to operational activities.

The thorough preparation process, cleanliness of the working area and the speed of installation were also highlighted. The completed floor delivered a durable, compliant and clearly defined working environment consistent with aerospace manufacturing standards.

THE SYSTEM WE INSTALLED

Resin Flooring Type Used

Resin High Build Coating

A solvent free epoxy coating applied in two or more coats, building a film thickness of up to 1,000 microns. It is specified for medium duty use where the requirement is a clean, hard wearing surface over sound concrete.

Aggregate is scattered between coats where a slip resistant finish is needed. Anticipated life is 5 to 7 years in light use and 2 to 4 years under moderate use.

Resin High Build Coating characteristics
ApplicationApplied in two or more coats, solvent free
Intended UseMedium duty use
ThicknessUp to 1000 microns
ChemicalsSome resistance to chemical spillage
Slip ResistanceAggregate can be added to achieve a slip resistant finish
Anticipated LifeLight use 5-7 years / Moderate use 2-4 years
EXPLORE THE PORTFOLIO

More Case Studies Like This One

Operating within a busy dairy and cheese manufacturing facility in Wrexham, this project involved a comprehensive 350m² industrial resin flooring installation. The client’s existing floor had become severely

WalesHigh Build Coating

As part of a long-term refurbishment programme within a world-leading aerospace manufacturing facility in Birmingham, this phase covered approximately 95m² of operational floor space. The works formed Phase

BirminghamHigh Build Coating

Project Type: Resin Quartz-Effect Garage Flooring InstallationSector: ResidentialLocation: KnutsfordApproximate Floor Size: 38m²Flooring System: High-build epoxy resin system with full quartz aggregate broadcast in the Wizard colour blend, sealed

KnutsfordHigh Build with Quartz Aggregate

This residential garage resin flooring installation in Cheadle Hulme, Cheshire, presented multiple challenges that required specialist expertise. The single garage measured approximately 28 metres squared and suffered from

Cheadle HulmeHigh Build Coating

JD Flooring Limited recently completed a comprehensive garage resin flooring installation for a residential client in Disley, Cheshire. The client contacted our team following the failure of a

DisleyHigh Build Coating

This case study examines a recent resin flooring installation project completed for a utilities company specialising in water treatment services. Located in Cheshire, the project involved transforming an

CheshireHeavy Duty Polyurethane Screed

JD Flooring recently completed a significant resin flooring installation for a warehousing and distribution operator based in West Yorkshire. The project involved refurbishing approximately 1,600m² of flooring in

West YorkshireHigh Build Coating

JD Flooring recently completed a comprehensive resin flooring installation project for an expanding food sector distribution centre in East Yorkshire. The project encompassed a substantial floor area of

East YorkshireHigh Build Coating

The scope of this resin flooring installation project encompassed a substantial 700m² warehouse space connected to a hospice charity outlet in Staffordshire. This previously underutilised facility had already

StaffordshireHigh Build Coating

FREE SURVEY AND FIXED QUOTATION

Talk to Us About Your Floor

Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.

Please enable JavaScript in your browser to complete this form.