RESIN FLOORING CASE STUDY

Resin Flooring Installation Scotland

Location
Scotland
Sector
Oil & Gas
System
Resin High Build Coating
Floor area
1,100m²

Project Overview

Over the course of five years, JD Flooring Ltd has consistently provided exceptional flooring solutions to our client, a notable oil export company. 

In our most recent project, we were tasked with the meticulous refurbishment of a large 1,100 square metre area. This space had been equipped with a 6mm polyurethane screed by our own team three years prior, which had now begun to exhibit considerable wear and tear.

An extensive industrial facelift was in order, to rejuvenate and revitalise the work area, providing a seamless working environment for the company’s daily operations.

Assessment and Recommendation

Our team embarked on a detailed assessment of the project, resulting in a strategic plan to utilise HTC grinding machines to recondition the area effectively.

Our initial analysis had led us to anticipate the necessity for thorough grinding and buffing of all areas twice. This was a vital step, to expose the split aggregate within the screed, thereby ensuring the creation of a strong bond for the impending new coating.

Preparation and Repair

Installation Details

To keep to our stringent project timeline of four days, we kicked off our operations by installing oil-contaminated epoxy primers overnight. This forward-thinking and proactive approach ensured we had a sound foundation and sufficient window to complete the project within the stipulated timeframe.

Post the extensive preparation and necessary repairs, it was time for the installation of the first layer of epoxy high build coating. A squeegee method was employed for this purpose, a technique that permits the application of a thicker layer of coating. Subsequently, back rolling of the coated areas was carried out, ensuring a uniform finish that was primed and ready for the next crucial phase – the final coat.

Upon sufficient curing of the first scratch coat, the final application of the epoxy high build coating took place. To enhance the slip resistance of the flooring, kiln-dried aggregate, with dimensions ranging from 0.3mm-0.6mm, was incorporated into the epoxy. This not only provided a robust and enduring finish, but it also significantly amplified the compliance with the rigorous day-to-day health and safety requirements that are critical in such industrial environments.

Once the final coat had been successfully applied and cured, the reinstatement of the 100mm yellow demarcation lines and walkways commenced. This crucial task extended to the manufacturing areas, storage spaces, and various walkways, all of which were refreshed in their distinct colours. This resulted in an impressively cohesive, clean, and crisp finish that revitalised the entire workspace.

The Finished Floor

Client Feedback and Satisfaction

This comprehensive refurbishment project illustrates JD Flooring Ltd’s ability to manage extensive and complex flooring refurbishments while adhering to strict timelines. Our commitment to using state-of-the-art techniques and high-quality materials ensured the renewed floor was not only aesthetically pleasing but also functional and safe, resulting in a high level of client satisfaction.

THE SYSTEM WE INSTALLED

Resin Flooring Type Used

Resin High Build Coating

A solvent free epoxy coating applied in two or more coats, building a film thickness of up to 1,000 microns. It is specified for medium duty use where the requirement is a clean, hard wearing surface over sound concrete.

Aggregate is scattered between coats where a slip resistant finish is needed. Anticipated life is 5 to 7 years in light use and 2 to 4 years under moderate use.

Resin High Build Coating characteristics
ApplicationApplied in two or more coats, solvent free
Intended UseMedium duty use
ThicknessUp to 1000 microns
ChemicalsSome resistance to chemical spillage
Slip ResistanceAggregate can be added to achieve a slip resistant finish
Anticipated LifeLight use 5-7 years / Moderate use 2-4 years
EXPLORE THE PORTFOLIO

More Case Studies Like This One

The NHS Project posed a unique challenge: tight timelines set by the main contractor coupled with a demanding workload due to a faulty screed overlaying the concrete substrate.To

YorkshireHeavy Duty Flowable

As the project progressed, the magnitude of the challenge became evident. The building’s poor condition, largely due to the neglect of the former tenant, presented a series of

ReadingHigh Build Coating

With a longstanding reputation for offering the highest quality of service to their vast customer base, this prominent UK supermarket chain was determined to enhance a dedicated area.Their

CheshireHigh Build Coating

The project was essentially about fixing a job that had been poorly done by another contractor. Our initial site survey revealed that the previous contractor hadn’t prepared the

ManchesterHeavy Duty Flowable

Our client is a Timber Truss Manufacturer, based in Scotland who operates a timber mill, dating back to the 1920s. The site itself is 425m2 and has endured

ScotlandHigh Build Coating

Based in Birmingham, this UK distribution company is responsible for storing and distributing a diverse range of products, with a vast logistical network. They operate out of four

BirminghamHeavy Duty Polyurethane Screed

An international timber importer based in Grangemouth, Scotland, operates from a century-old building spanning 550m2. In the bustling world of manufacturing, every moment counts and for this client

ScotlandHigh Build Coating

Over the course of five years, JD Flooring Ltd has consistently provided exceptional flooring solutions to our client, a notable oil export company. In our most recent project, we

ScotlandHigh Build Coating

Our client, a renowned UK bodyshop group, engaged JD Flooring Ltd for the fourth time, demonstrating their trust in our expertise, professionalism, and results. This project posed a

West MidlandsHigh Build Coating

FREE SURVEY AND FIXED QUOTATION

Talk to Us About Your Floor

Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.

Please enable JavaScript in your browser to complete this form.