Project Overview

With a longstanding reputation for offering the highest quality of service to their vast customer base, this prominent UK supermarket chain was determined to enhance a dedicated area.

Their aim was clear: to foster a safe, clean, and conducive workspace for the hardworking team. This space, of approximately 2100m2, was originally a storage facility, was envisioned to transition into an active packing and processing hub.

The challenge was to introduce a fresh, appealing floor finish that seamlessly aligned with the brand’s high standards. JD Flooring, with its proven track record, was called upon to meet and exceed these exacting specifications.

Assessment and Recommendation

Fortunately, the underlying floor or substrate was in remarkably good condition, making it a stong starting point. The area, having previously housed storage racks, revealed a notable presence of over 2000 bolt holes upon their removal.

These needed thorough attention to ensure a uniform surface. Following an in-depth evaluation, the decision was cemented to proceed with a 2 coat high build coating.

This meant the initial tasks revolved around preparing the substrate, which involved a meticulous process of grinding and filling the myriad bolt holes.

Preparation and Repair

The relatively good condition of the substrate led to the choice of shot blasting the entire space as the preferred preparation technique.

Following the completion of this preparation phase, the team dedicated significant effort to address the bolt holes and other minor flaws, ensuring a surface devoid of imperfections and ready for the coating.

Installation Details

Upon completion of the meticulous preparation, the stage was set for the main event: applying the 2 coat high build epoxy coating. The first coat was systematically applied with the aid of a squeegee, followed by back-rolling to ensure an even, consistent finish.

A day later, the process was repeated for the second coat, but with a strategic addition: a fine aggregate was blended into the mix to bolster slip resistance. This enhancement was vital to guarantee the safety of all on-site personnel and machinery.

The Finished Floor

Client Feedback and Satisfaction

To enhance on-site safety and operational efficiency, well-defined demarcation lines were implemented. These lines play a crucial role in demarcating the boundaries between general work areas and the zones frequented by forklifts. Such clear divisions not only optimise workflow but also act as a preventive measure against potential accidents.

Securing a project from a client of this size is a testament to the reputation, competitive pricing and professionalism of JD Flooring. We were able to secure this contract despite several other competitors tendering for this project. Following completion, during a follow up site visit, our client expressed their delight with the results and the conduct of our on site team during the preparation and installation process.

THE SYSTEM WE INSTALLED

Resin Flooring Type Used

Resin High Build Coating

A solvent free epoxy coating applied in two or more coats, building a film thickness of up to 1,000 microns. It is specified for medium duty use where the requirement is a clean, hard wearing surface over sound concrete.

Aggregate is scattered between coats where a slip resistant finish is needed. Anticipated life is 5 to 7 years in light use and 2 to 4 years under moderate use.

Resin High Build Coating characteristics
ApplicationApplied in two or more coats, solvent free
Intended UseMedium duty use
ThicknessUp to 1000 microns
ChemicalsSome resistance to chemical spillage
Slip ResistanceAggregate can be added to achieve a slip resistant finish
Anticipated LifeLight use 5-7 years / Moderate use 2-4 years
EXPLORE THE PORTFOLIO

More Case Studies Like This One

Operating within a busy dairy and cheese manufacturing facility in Wrexham, this project involved a comprehensive 350m² industrial resin flooring installation. The client’s existing floor had become severely

WalesHigh Build Coating

As part of a long-term refurbishment programme within a world-leading aerospace manufacturing facility in Birmingham, this phase covered approximately 95m² of operational floor space. The works formed Phase

BirminghamHigh Build Coating

Project Type: Resin Quartz-Effect Garage Flooring InstallationSector: ResidentialLocation: KnutsfordApproximate Floor Size: 38m²Flooring System: High-build epoxy resin system with full quartz aggregate broadcast in the Wizard colour blend, sealed

KnutsfordHigh Build with Quartz Aggregate

This residential garage resin flooring installation in Cheadle Hulme, Cheshire, presented multiple challenges that required specialist expertise. The single garage measured approximately 28 metres squared and suffered from

Cheadle HulmeHigh Build Coating

JD Flooring Limited recently completed a comprehensive garage resin flooring installation for a residential client in Disley, Cheshire. The client contacted our team following the failure of a

DisleyHigh Build Coating

This case study examines a recent resin flooring installation project completed for a utilities company specialising in water treatment services. Located in Cheshire, the project involved transforming an

CheshireHeavy Duty Polyurethane Screed

JD Flooring recently completed a significant resin flooring installation for a warehousing and distribution operator based in West Yorkshire. The project involved refurbishing approximately 1,600m² of flooring in

West YorkshireHigh Build Coating

JD Flooring recently completed a comprehensive resin flooring installation project for an expanding food sector distribution centre in East Yorkshire. The project encompassed a substantial floor area of

East YorkshireHigh Build Coating

The scope of this resin flooring installation project encompassed a substantial 700m² warehouse space connected to a hospice charity outlet in Staffordshire. This previously underutilised facility had already

StaffordshireHigh Build Coating

FREE SURVEY AND FIXED QUOTATION

Talk to Us About Your Floor

Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.

Please enable JavaScript in your browser to complete this form.