RESIN FLOORING CASE STUDY

Factory Resin Flooring Warrington

Location
Warrington
Sector
Engineering
System
Resin High Build Coating
Floor area
165m²

Project Overview

An engineering company based in Warrington recently relocated to new premises, requiring their 165m2 manufacturing floor space to be brought up to health and safety standards. The client also had a company requirement for all operational areas to achieve aesthetic standards and ensure easy cleaning and maintenance of the flooring.

The existing floor had been coated repeatedly, resulting in a 1mm thick coating in some places. JD Flooring assessed the area and presented a proposal to the client, focusing on thorough preparation.

Assessment and Recommendation

After surveying the floor, JD Flooring suggested using a double-headed diamond tip grinder to remove the multiple layers of existing epoxy coating. We then recommended installing a 2-pack epoxy high build system with a fine aggregate to improve slip resistance and overall health and safety.

During the removal process, it became evident that the previous epoxy flooring system had been installed without proper subfloor preparation. As a result, the removal was easier than anticipated, with around 50-70Kg of the previous flooring being removed.

Poor adhesion: Without proper subfloor preparation, the epoxy flooring system did not adhere correctly to the substrate. This lack of adhesion likely led to the flooring peeling, chipping, or delaminating prematurely, necessitating frequent repairs or recoating. How does the constant need for repairs impact the cost-effectiveness of a flooring solution?

Uneven surface: Failing to address imperfections in the subfloor before installation resulted in an uneven surface, which may have caused the epoxy coating to wear unevenly. High spots or low spots in the substrate can lead to accelerated wear in certain areas, reducing the overall lifespan of the flooring. What safety hazards can an uneven flooring surface present in a manufacturing environment?

Moisture issues: If the previous occupants did not assess and address potential moisture issues in the subfloor, it could have led to the failure of the epoxy coating. Moisture can seep through the substrate, causing the flooring to bubble, warp, or delaminate. How can moisture-related problems contribute to the deterioration of a resin flooring system?

Inadequate cleaning: Improper cleaning of the subfloor before installation can result in contaminants being trapped beneath the epoxy coating. These contaminants can interfere with the bonding process and lead to the premature failure of the flooring system. Why is a thorough cleaning of the subfloor essential for achieving a long-lasting flooring solution?

The previous occupants’ solution of simply adding another layer of epoxy coating without addressing the underlying issues was a short-term fix that ultimately exacerbated the problem and likely incurred higher costs in the long run.

Preparation and Repair

The preparation process involved using the suggested grinders, as well as flatbed grinders for edges and around columns. The “goods-in” area was also prepared.

Our preparation phase was conducted with exceptional care to ensure the floor’s surface was evenly treated. This equipment, known for its efficiency, was vital for smoothing the large area swiftly.

After completing the preparation, several holes and cracks in the substrate were identified and repaired using a suitable repair mortar.

Installation Details

Once all preparation and repair work were completed, the areas were thoroughly cleaned to ensure a dust-free environment before installation commenced. JD Flooring installed the first coat of epoxy high build using a squeegee method and back rolled it to produce a smooth finish. This first coat was left overnight to cure.

The following day, the cracks and repair areas we attended to again to ensure the final layer would result in a perfect finish. The same installation method was repeated, this time scattering a 0.4mm-0.8mm aggregate into the surface and back-rolling to an even finish. The result was a perfect finish for the environment and the new working area. 

The Finished Floor

Factory Resin Flooring Warrington

Client Feedback and Satisfaction

The client expressed his delight at the work carried out and the new finish. As a direct result of the quality of work completed by JD Flooring, the client has confirmed that he wishes to appoint us again to install resin flooring in the rest of the building later this year.

THE SYSTEM WE INSTALLED

Resin Flooring Type Used

Resin High Build Coating

A solvent free epoxy coating applied in two or more coats, building a film thickness of up to 1,000 microns. It is specified for medium duty use where the requirement is a clean, hard wearing surface over sound concrete.

Aggregate is scattered between coats where a slip resistant finish is needed. Anticipated life is 5 to 7 years in light use and 2 to 4 years under moderate use.

Resin High Build Coating characteristics
ApplicationApplied in two or more coats, solvent free
Intended UseMedium duty use
ThicknessUp to 1000 microns
ChemicalsSome resistance to chemical spillage
Slip ResistanceAggregate can be added to achieve a slip resistant finish
Anticipated LifeLight use 5-7 years / Moderate use 2-4 years
EXPLORE THE PORTFOLIO

More Case Studies Like This One

As a trusted partner and the approved contractor for a large electrical and electronics manufacturer based in Stockport, JD Flooring recently completed a resin flooring demarcation project to

StockportHigh Build Coating

As a trusted partner and the approved contractor for this international distribution company based in the West Midlands, JD Flooring was tasked with the annual re-coating of the

West MidlandsHigh Build Coating

An engineering company based in Warrington recently relocated to new premises, requiring their 165m2 manufacturing floor space to be brought up to health and safety standards. The client

WarringtonHigh Build Coating

An renowned International Oil Export Company, located in the heart of the West Midlands, approached JD Flooring Ltd for a significant update on their resin screed flooring system. Five

West MidlandsHigh Build Coating

This project involved a prominent Cheese Producing Company, based in Wales, who are widely recognised for their quality products in the Food Sector.This client, was already familiar with

WalesHigh Build Coating

Returning to JD Flooring Ltd, the client, an avid collector of high-end sports cars, had constructed a new garage in rural Cheshire.

CheshireHigh Build Coating

Our client is a globally renowned Pharmaceutical Company, setting the benchmark in the industry. They operate in a sector where precision, cleanliness, and compliance with stringent standards are

LeicesterFloor Seal

A key player in the global market, this Leicester-based timber truss and components manufacturer faced a specific challenge within their facility.The project involved installing epoxy resin demarcation across

LeicesterHigh Build Coating

This project involved a prominent Cheese Producing Company, based in Wales, who are widely recognised for their quality products in the Food Sector.This client, was already familiar with

WalesHigh Build Coating

FREE SURVEY AND FIXED QUOTATION

Talk to Us About Your Floor

Tell us how the area is reached, what happens in it and how long it can be closed. We attend, test the substrate, and put a written specification and a fixed price in front of you at no cost.

Please enable JavaScript in your browser to complete this form.